Bathroom Remodeling by Connor's Contracting
Bathrooms

Bathroom Remodeling

Full baths, powder rooms, and walk-in showers built waterproof from the substrate up.

Get a Free Estimate
Tile work that stays tight and dry for decades.

What Bathroom Remodeling Includes

Bathrooms are where shortcuts show up first. We waterproof properly, set tile dead level, and vent every fan to the outside — then finish with vanities, mirrors, and fixtures you actually picked.

Walk-in tile showers with glass enclosures, custom niches, heated floors, double vanities, and full accessible conversions. Rough plumbing and electrical are done in house, inspected, and closed out clean.

What's Included:

Waterproofed Walk-In Tile Showers
Custom Vanities & Lit Mirrors
Heated Floor Systems
Fixture & Valve Replacement
Proper Exhaust Venting
Powder Room Build-Outs
Request a Quote
Bathroom Remodeling build 1Bathroom Remodeling build 2Bathroom Remodeling build 3Bathroom Remodeling build 4
Typical timeline
2–4 weeks per bath
Who's on site
Dedicated tile setter and plumber
Permits
Plumbing and electrical permits on full gut baths
Process

How a Bathroom Remodeling Job Runs

01

Scope the wet areas

We open a small area if needed to see the drain, venting, and framing before we quote it.

02

Fixture selections

Vanity, valve, tile, and glass picked early — valves have to be in hand before rough-in.

03

Demo & waterproofing

Full tear-out to studs, new blocking, then a bonded waterproof membrane on pan and walls.

04

Tile & glass

Tile set level with proper slope to drain, niches built in, then glass templated after tile cures.

05

Fixtures & final

Vanity, trim, mirrors, fan venting to exterior, and a leak test before we call it done.

Materials & Specs

What We Build With

  • Bonded waterproof membrane
  • Schluter niches & trim
  • Porcelain, marble & mosaic tile
  • Frameless glass enclosures
  • Heated floor mats

Waterproofing is the part nobody sees and the only part that decides whether the shower lasts.

Common Questions

Bathroom Remodeling, Answered

How long are we without that bathroom?

Two to four weeks depending on tile complexity and glass lead time. We give you the real date, not the optimistic one.

Can you convert a tub to a walk-in shower?

Yes — including curbless conversions and grab-bar blocking for aging in place.

Why do tile showers leak?

Almost always missing or shortcut waterproofing. We photograph the membrane before tile so you can see it was done.

Let's Build It Right

Schedule a free walkthrough and we'll map out what's possible in your home.