Home Additions by Connor's Contracting
Additions

Home Additions

Bump-outs, second stories, in-law suites, and garage conversions — engineered and permitted.

Get a Free Estimate
More house, without moving.

What Home Additions Includes

Additions are the most involved work we do, and the most planned. We handle architectural drawings, engineering, zoning, and permits before demolition so the timeline is real.

Foundation or slab, framing, roof tie-in, siding, windows, HVAC extension, electrical, and full interior finish. Your existing home stays weather-tight and livable through the build.

What's Included:

Drawings, Engineering & Permits
Foundation or Slab Work
Framing & Roof Tie-In
Siding, Windows & Roofing
HVAC, Plumbing & Electrical Extension
Complete Interior Finish
Request a Quote
Home Additions build 1Home Additions build 2Home Additions build 3Home Additions build 4
Typical timeline
3–6 months
Who's on site
Full crew plus engineer and licensed subs
Permits
Drawings, engineering, zoning, and building permits
Process

How a Home Addition Job Runs

01

Feasibility

Setbacks, lot coverage, and structure — we tell you what's actually buildable before you pay for drawings.

02

Design & engineering

Architectural plans and stamped engineering, then zoning and permit submission.

03

Foundation & framing

Footings or slab, framing, and roof tie-in — dried in and weather-tight fast.

04

Mechanicals

HVAC extension, plumbing, and electrical run and inspected before insulation and drywall.

05

Finish & tie-in

Siding, windows, flooring, trim, and paint blended into the existing house so it never reads as an add-on.

Materials & Specs

What We Build With

  • Engineered beams & LVL
  • Matched siding & roofing
  • Andersen & Pella windows
  • Spray foam & batt insulation
  • Blended interior trim

An addition is 80% planning. When the planning is right, the build is boring — and boring is the goal.

Common Questions

Home Additions, Answered

Can we live here during the addition?

Yes for most projects. The new structure is built and dried in before we open the existing wall.

How much of the timeline is permits?

Often 6–12 weeks before a shovel moves. We start that clock early and keep you posted on it.

Do you do second stories?

Yes, with engineering to confirm the existing foundation and framing can carry the load.

Let's Build It Right

Schedule a free walkthrough and we'll map out what's possible in your home.

Get a Free Estimate
Start Your Project

Free Project Estimate