Finished basement lounge with pool table, leather sectional, and wall-mounted TV
All ProjectsBasement Finishing

Finished Lower Level

Cherry Hill, NJ
Completed 2024
850 sq ft basement
7 weeks
Location
Cherry Hill, NJ
Completed
2024
Scope
Basement Finishing
Duration
7 weeks
The Project

What We Were Asked to Build

An unfinished basement turned into a full lounge — framed, insulated, and wired top to bottom, with a game area, media wall, and below-grade-rated flooring.

The homeowners wanted a place for teenagers to hang out and for adults to watch games. It had to stay warm, dry, and comfortable year-round.

Problem & Solution

The Challenge

The basement had a history of dampness along one wall. Finishing it without solving moisture first would have led to mold and ruined finishes.

Our Solution

We graded the exterior drain line, sealed the wall, and added a dehumidifier drain. Then we framed a half-inch off the concrete to allow air movement behind the studs.

Project Gallery

On-Site Photos

It's the room everyone ends up in. And it smells like new construction, not a basement.
Homeowner, Cherry Hill

Your Project Could Be Next

Every job on this page started with a walkthrough and a clear, itemized estimate. Tell us what you are planning and we will show you how it gets built.

Start Your Project

Free Project Estimate