Wide-plank engineered hardwood flooring installed through a bright living space
All ProjectsFlooring Installation

Whole-Home Flooring Install

South Jersey
Completed 2023
1,400 sq ft
2 weeks
Location
South Jersey
Completed
2023
Scope
Flooring Installation
Duration
2 weeks
The Project

What We Were Asked to Build

Carpet and dated laminate removed throughout the first floor and replaced with wide-plank engineered hardwood, with tile in the entry and bath.

The homeowners wanted one continuous flooring material that could handle dogs, kids, and sandy shoes from the shore.

Problem & Solution

The Challenge

The old laminate was glued down in spots and the subfloor had high and low areas that would telegraph through the new hardwood.

Our Solution

We scraped the adhesive, sanded the high spots, and filled the low spots with leveling compound. The hardwood went down flat and quiet.

Project Gallery

On-Site Photos

Your Project Could Be Next

Every job on this page started with a walkthrough and a clear, itemized estimate. Tell us what you are planning and we will show you how it gets built.

Start Your Project

Free Project Estimate